Skip to Content
  • Plumber Burton Upon Trent
  • Boiler Changes Derby,Burton upon Trent
  • Bathrooms Derby,Burton upon Trent
  • Central heating Derby
  • Plumber Derby
  • Emergency Gas Engineers Derby
  • Gas Engineer Derby
  • Gas courses in UK

3 Trades Ltd

08 - Mar - 2010

Your leading CORGI gas engineer

Guarantee Gas Engineer

Guartantee

Our Guarantee

Terms of Conditions

Price

The price quoted is strictly net and is based on current costs of equipment, materials and labour.

Allowance has been made in the price for any old fittings and materials that shall be removed by the Contractor, and any redundant equipment will be removed without allowance or charge but that in the case of an existing oil fired installation, the tank will be disconnected, but the disposal of oil and the removal of the tank will be the responsibility of the Customer or will be removed by the Contractor for an additional charge.

The tender may be accepted at any time within a period of 30 days from the date of tender and, if not accepted within such a period, shall lapse. In the event of the tender being accepted within such a period of 30 days, the Contractor may by giving notice to the Customer at any time up to 7 days before delivery, increase the price of goods to reflect any increase in the cost to the Contractor which is due to factors occurring after making of the tender which shall be beyond the reasonable control of the Contractor provided that the Customer may cancel his contract in writing of any such notice from the Contractor.

The Contractor may make an extra charge in respect of any period of time during which he is unable to proceed with the work on account of delays, which have arisen through no fault of his own.

The tender is based on work being done during normal working hours (normal working hours being between 8am and 5pm Monday to Friday and excluding Bank Holidays). If the Customer requires work to be completed outside of the normal working hours, the Contractor maybe entitled to make reasonable additional charges for the extra costs incurred.

Terms of Payment

Payment of the price and VAT as detailed in the invoice will be due on completion of the work and shall be made within 14 days of delivery of the invoice.

Any progress payments, which will become due, are detailed in the tender. In addition to these, the Contractor has a right to call for a proportionate progress payment of 33% of the total tender price in the event of delay to the work caused beyond the Contractor's control. The Contractor also reserves the right to ask and receive a deposit before commencing any work.

Interest at 2.5% above the Contractor's Bank's current unsecured bank overdraft rate may be charged on overdue accounts.

The Customer undertakes to make any payment due hereunder in full without any deduction, offset or counterclaim whatsoever saved in respect of any credit note issued to it by the Contractor.

General Guarantee

The Contractor will make good any defects due to bad workmanship, repair and/or replace any defective materials or goods supplied provided that any defects are brought to the notice within 6 months of completion of the works.

Any work done for a client comes with a 12month guarantee from 3 Trades Ltd. Any products supplied by our engineers from 3 Trades Ltd come with guarantee stated on their product.

For full Terms and Conditions please apply to 3 Trades Ltd.

  • Corgi Engineer Derby
  • Gas Training Derby
  • Gas Engineer Burton Upon Trent
  • Training Course
  • Central Heating Burton upon Trent,Derby
  • Gas Training course
  • emergency plumber
  • plumbing work